Weekly Spotlights
This page is a collection of weekly spotlights that highlight the progress of the Mechanics team. Each spotlight is a summary of the work done by the team in a week.
2025-04-03
Done:
- Finish main aluminum profile structure to increase the height of the xArm and to add more support points in the DashGo to avoid the robot overturn.
- Add tags to the robot voltmeters and switches.
- Meeting with Dr. Enrique Cuan for possible research paper collaboration.
In progress:
- Fix gripper design to operate to the servo range from 0 to 120° due to an error in our specific servo unit.
- Reprint gripper pieces with the aforementioned fix.
- Test the improvements of the new structure and do fixes accordingly.
- Finish new Robot cover design to comply with the new structure.
2025-04-10
Done:
- Finish CAD
- Buy acrylic sheets
- Meeting with Dr. Erick to talk about gripper research paper
- Small changes and fixes to gripper design
- Fixed robot legs from bending
In progress:
- Laser cut acrylic sheets before holiday season
- Print gripper final design
2025-04-17
Holiday season
2025-04-24
Done:
- New robot acrylic cover
- New gripper printed and assembled (waiting for PCB to solder)
- Follow-up meeting with Dr.Cuan
In progress:
- Finish robot acrylic door and aesthetic details
- Install and test gripper and see if any improvements should be done